Tuesday, October 29, 2013

Operation Bathroom is Complete

A lot has happened since our last bathroom post, but we will fast forward a little bit. It might appear that Nicole wrote this post based on the byline, but I assure you that the poor sentence structure and awkward phrasing is all Adam. Let's move on....

We planned to tile the tub surround on a Saturday and grout on following Sunday. Easy, right? 


 Our pattern took a little while to establish and it was helpful to have it laid out. 


The tile saw was very easy to use. Props to Dave K for lending us the supplies. 


Working late into the night, we realized that this would not be a simple weekend job. Tensions ran high at times, but Oskar Blues was there to help ease the pain. 


The next day we worked to finish the tiling and even though it was taking longer, the impending outcome kept our spirits high. 


Drilling holes into tile was so much easier than I expected. I could drill holes like these all day. 


Grout work began the following Saturday. Several rest periods were mandatory for all the pregnant women of the house. 


The shower surround was finally complete. 


On Sunday we started laying the floor tile.  


It went so fast that we had time to visit Dave's Brewfarm later that afternoon.


All the heaviest work was complete and it was time to finish this damn thing. Nicole was put on trim painting patrol. 


Fast forward again and we are done with this stupid bathroom. Thankfully it looks great. 


 Here are some after and before shots.






This project was 90% the great work of our contractor, Brad Johnson. He worked quickly and with a strong dedication to quality. We can't recommend him enough. 

We complained for years about the bathroom and would like to thank the little man below for inspiring us to complete it before he arrived. 

Get used to this face, because you will be seeing a lot of him on this blog. 


1 comment:

Anonymous said...

Love the new bathroom, but LOVE Oliver even MORE !!
Grandma/pa Johnson